Transport in Turkey

The rail network was 8,682 km in 1999, including 2,133 km of electrified track. The Turkish State Railways started building high-speed rail lines in 2003. The first line, which has a length of 533 km from Istanbul (Turkey's largest metropolis) via Eskişehir to Ankara (the capital) is under construction and will reduce the travelling time from 6–7 hours to 3 hours and 10 minutes. The Ankara-Eskişehir section of the line, which has a length of 245 km and a projected travel time of 65 minutes, is completed. Trials began on April 23, 2007, and revenue earning service began on March 13, 2009. The Eskişehir-Istanbul section of the line is scheduled to be completed by 2009, and includes the Marmaray tunnel which will enter service in 2012 and establish the first ever railway connection between Europe and Anatolia.

The road network was an estimated 382,397 km in 1999, including 95,599 km of paved roads and 1,749 km of motorways. There are 1,200 km of navigable waterways. There were 118 airports in 1999, including six international airports in Istanbul, Ankara, İzmir, Trabzon, Dalaman and Antalya. Etiketler: ,

0 yorum:

Post a Comment